Skip to content
Energex network · 4218

Solar export limits in Mermaid Beach

Plenty of export capacity

Export capacity around Mermaid Beach is in good shape. 98% of local transformers with published data still have at least 20% of their export capacity available.

That's the suburb-level picture. Export limits are set per transformer, and a street can differ from the one behind it, so check your own address to get the answer that applies to you.

83
transformers with published data within 1.5 km
98%
have 20% or more of their export capacity still available
395 kW
median export capacity still available per transformer
2%
are getting tight or constrained (under 20% left)
Solar export checker

Check your Mermaid Beach address

Type your street address and we'll look up the Energex transformer that supplies it on Energy Queensland's capacity map, live.

The local picture

How Mermaid Beach's transformers are tracking

Energex colours every transformer by how much of its solar export capacity is still free. This is the mix for the 100 transformers within 1.5 km of Mermaid Beach.

  • 40 to 100% available76
  • 20 to 40% available5
  • 10 to 20% available1
  • 5 to 10% available0
  • under 5% available1
  • no published data17

Mermaid Beach is on the Energex network, which covers south-east Queensland. For small customers a basic connection allows 5 kW of export per phase (5 kW single-phase, 15 kW three-phase). A Dynamic Connection, available since July 2023, lets the limit flex up to 10 kW per phase when the network has capacity.

South-east Queensland has some of the highest rooftop solar uptake in the world, so export capacity can change street by street. The suburb snapshot below tells you how the area is tracking; the checker tells you about your own transformer.

None of the 83 transformers with published data are currently curtailing exports during the day, which is a good sign for anyone adding solar in Mermaid Beach now.

Upstream headroom

The nearest zone substation, Miami (1.7 km away), reports 16.3 MVA of export capacity available against a 44.7 MVA rating. Street-level transformers, not the substation, are the usual bottleneck.

Source

Energy Queensland Network Load & Export Capacity Map, snapshot taken 15 September 2026. Indicative only; limits are confirmed when the network assesses a connection application.

Questions from Mermaid Beach

Export limits in Mermaid Beach, answered

Can I export solar to the grid in Mermaid Beach?
In most cases, yes. Of the 83 local transformers with published data, 98% still have at least 20% of their export capacity available, which normally means the standard 5 kW per phase export limit applies. 2% are getting tight or constrained, so it's worth checking your exact address above.
What export limit will I get in Mermaid Beach?
On a basic Energex connection it's 5 kW per phase: 5 kW for a single-phase home and 15 kW on three-phase. A Dynamic Connection can raise that to 10 kW per phase when the network has room. On a transformer that's nearly full, a new fixed connection may be limited to 1.5 kW, which is another reason to ask for a Dynamic Connection.
Where does this data come from?
From Energy Queensland's public Network Load & Export Capacity Map, which Energex publishes for engineers and installers. The suburb figures on this page are a snapshot of the map taken on 15 September 2026 for transformers within 1.5 km of Mermaid Beach. The address checker queries the map live.
Is a battery worth it if my export is limited?
Usually the case for a battery gets stronger, not weaker. Export limits cap what you sell back at a low feed-in rate; a battery stores that power for the evening when you'd otherwise buy it at full price. We model both options with your bill before recommending anything.
Ready when you are

Get in Touch Today!

Get a no-obligation quote from a real solar expert. Honest advice, no commission-only sales reps, no pushy follow-ups.